Categories: Business

Green power body urges TANGEDCO Chief to delegate authority for faster WEG extensions

The Renewable Energy Producers Association (REPA) of Tamil Nadu has raised concerns over delays in processing lifetime extensions for wind energy generators (WEGs) that have completed 20 years of operation. The Association has written to the Chiefs of TANGEDCO (Tamil Nadu Generation and Distribution Corporation) and TNGECL (Tamil Nadu Green Energy Corporation Ltd) to delegate the authority for processing addendums to energy wheeling agreements (EWAs) to Circle Level Superintending Engineers.

The Association believes this move would significantly ease business operations and eliminate unnecessary delays in extending the lifetime of WEGs that have completed 20 years of operation.

Currently, the process is being centrally handled by the Chief Engineer (NCES) office, leading to backlogs and delays. The association highlighted that these delays have led to the blocking of the AMR Portal, preventing WEGs from allocating power for captive consumption at the beginning of each month. This has caused widespread difficulties, as authorities of the distribution utility mandate power allotments before the 7th of each month, creating a paradox where compliance becomes challenging due to system blockages, the Association said in their communication to the Chiefs of TANGEDCO and TNGECL.

  • Also read: Print advertising records better y-o-y performance over TV medium

The issue of lifetime extensions for WEGs is under judicial review, with the Hon’ble Madras High Court previously ordering TNGECL to execute the required addendums in a judgment dated January 27, 2022. However, due to an appeal by TANGEDCO, the matter is still pending before the Division Bench, which has nonetheless directed compliance with the earlier order until a final decision is reached,

Representing over 700 renewable energy generators with a combined capacity of more than 7,000 MW in Tamil Nadu, REPA has urged heads of State Power Organisations to take immediate steps to streamline the process.

K Venkatachalam, Chief Advisor and CEO of REPA, emphasised that granting execution powers to the Circle Level Superintending Engineers—who are the actual signatories to the addendums —would remove bureaucratic roadblocks and ensure smoother operations for the renewable energy sector in the State.

Source link

nasdaqpicks.com

Recent Posts

VC backed by Cambridge university launches £100mn start-up fund

Unlock the Editor’s Digest for freeRoula Khalaf, Editor of the FT, selects her favourite stories…

2 minutes ago

PMS vs mutual funds: How have portfolio managers fared on returns?

Portfolio management schemes (PMS) are intended to outperform the market and the investment vehicle for…

15 minutes ago

LCC Projects files draft papers with Sebi, to raise funds via IPO

Ahmedabad-based LCC Projects has filed preliminary papers with the capital markets regulator Sebi to mobilise…

18 minutes ago

Decaffeinated Brazilians blame Lula for surging cost of morning brew

Unlock the Editor’s Digest for freeRoula Khalaf, Editor of the FT, selects her favourite stories…

19 minutes ago

Trump again attacks USAID, claims $18 mn given to India to help with elections

US President Donald Trump has claimed that the Biden administration allocated $18 million in funding…

24 minutes ago

Global market: Why is China stock market rising despite Trump’s tariff barriers? EXPLAINED with five crucial reasons

Global market: Amid fear of US President Donald Trump's tariff barrier and trade war, most…

26 minutes ago